NATURE OF THE CASE: This was a dispute over a contract bid. Boise (P) sought review of the trial court's determination that Mattefs (D) was entitled to the equitable relief of rescission on the basis of mistake.
FACTS: Mattefs (D) submitted a bid to Boise (P) for construction. D was the third lowest bidder but the others below him refused to accept the bid. P sued D for the difference in its bid price and those that were accepted. The trial court ruled for D and P appealed.